Late in 2019, State Parks requested funds to rebuild the road bridge inside Butano State Park. The 50 ft long vehicle bridge on the Butano entrance road is the only access to the campground and water treatment plant. It had extensive rot on perpendicular decking boards, wheel runner boards, and handrail posts.
In addition to rebuilding the bridge, the plan included raising the superstructure to increase channel flow, to improve drainage and to address a hard transition on the down-hill approach.
The Butano campground is closed December through March, so this winter was an ideal time to work on the bridge.
The completed bridge.